Draw the work as it is done
A process is a set of steps, repeated the same way, that turns an input into an output. Improvement starts with a process map: every step written down in order, as the work is actually done today. Most owners describe the tidy version from memory. The map comes from watching the work and writing down each thing your hands do.
Say you sell tudung from your home in Kuantan, taking orders by WhatsApp. You handle about 20 orders a day and feel you have no time left. You map one order and time each step with your phone over 10 orders. The figures below are the averages.
| Step | Minutes |
|---|---|
| Chat with the customer to confirm design, colour and address | 4 |
| Open the bank app and look for the payment | 3 |
| Copy the address by hand onto the courier label | 4 |
| Search the stock boxes for the item | 5 |
| Pack the parcel | 3 |
| Type and send the tracking number | 2 |
| Cycle time | 21 |
Cycle time is the working time one unit takes from the first step to the last. At 20 orders a day, 21 minutes each is 420 minutes: 7 hours spent on order handling alone. This first measurement is the baseline. An improvement with no baseline is an opinion.
What the customer pays for
Lean, the method that grew out of the Toyota Production System, sorts every step by one test. A step is value-adding if it changes the product or service in a way the customer would pay for. Everything else is waste, known in the field by the Japanese word *muda*. Some waste is needed for now, such as checking that payment arrived. The rest can go.
For your customer, value is the right tudung, confirmed and packed. Confirming the order (4 minutes) and packing (3 minutes) add value. That is 7 minutes out of 21, or 33%. Two thirds of the cycle time is searching, copying and checking.
Lean names eight wastes, remembered by the word DOWNTIME.
| Waste | Meaning | In your process |
|---|---|---|
| Defects | Work that must be redone | A wrong address copied by hand, a wrong colour sent |
| Overproduction | Making more, or sooner, than is needed | Pre-packing designs that then do not sell |
| Waiting | Work standing still | Orders held until you have time to check the bank |
| Non-utilised talent | Skill spent on work that needs none | Your eye for design spent on copying addresses |
| Transportation | Moving goods around | Carrying parcels between the bedroom store and the hall |
| Inventory | More stock than the work needs | Boxes of slow colours hiding the fast ones |
| Motion | Movement of the person | Opening five boxes to find one item |
| Extra processing | Doing more than the customer needs | Typing each tracking message from nothing |
Find the cause before the cure
In your last 200 orders, 6 parcels went out wrong: 4 to a wrong address and 2 with the wrong item. That is a defect rate of 3%. Each one costs about RM16 in postage back and out again, RM96 in all, and a customer who waits twice.
The tool for causes is the 5 Whys: ask why until the answer is something that can be changed. Why did the parcel go to the wrong address? The label was wrong. Why? You copied the address by hand from a chat. Why by hand? The address arrives as free text in the middle of a conversation. Why there? There is no fixed place for the customer to enter it. The root cause is the missing order form. Telling yourself to copy more carefully would treat the symptom. For a problem with many possible causes, the same search is drawn as a fishbone diagram, also called an Ishikawa diagram, with one branch for each family of cause.
Change one thing and test it
PDCA is the cycle for trying a change safely: Plan the change and the result expected, Do it on a small scale, Check the measurement against the baseline, Act by keeping the change or dropping it. The cycle is credited to Walter Shewhart and W. Edwards Deming and is also called the Deming cycle.
You plan an order form in which the customer picks the design and colour and types the address. You use it for one week, then time 10 orders again. You run the cycle again for shelves labelled by design and colour, for checking the bank twice a day in one sitting, and for a saved tracking message.
| Step | Before | After | What changed |
|---|---|---|---|
| Confirm the order | 4 | 1 | Order form replaces the chat |
| Check payment | 3 | 1 | Checked in two sittings a day |
| Address label | 4 | 1 | Printed from the form |
| Find the item | 5 | 1 | Labelled shelves |
| Pack | 3 | 3 | No change |
| Send tracking | 2 | 1 | Saved message |
| Cycle time | 21 | 8 |
Cycle time fell by 13 minutes, or 62%. At 20 orders a day the work takes 160 minutes against 420, which returns 4 hours and 20 minutes each day. In your next 200 orders, 1 parcel went out wrong: a defect rate of 0.5%, down from 3%.
The before and after figures can be compared only because both were measured the same way: the same steps, the same stopwatch, 10 orders each, an ordinary week. A new method timed in a quiet week against an old method timed during a sale proves nothing.
Many small changes of this kind, made continually by the person who does the work, are what the field calls Kaizen, Japanese for "change for the better".
Six Sigma in broad strokes
Lean attacks waste. Six Sigma, developed at Motorola in the 1980s, attacks variation: the way the same process gives different results on different days. Six Sigma counts defects per million opportunities, and a process at the six sigma level produces 3.4. Your 3% is 30,000 per million orders, and your 0.5% is 5,000.
Six Sigma projects follow DMAIC: Define the problem and what the customer needs, Measure the present performance, Analyse the causes, Improve the process, and Control the improved process so that the gain stays. Your work followed the same order without the statistics. A business that hires a Six Sigma practitioner, called a Green Belt or Black Belt, is paying for the statistics.
Make the new way the only way
An improvement lasts only if the old way cannot creep back. Standard work is the current best method written down: the steps, their order and the time each should take. A checklist is its shortest form. Your packing checklist has three lines: item matches the form, label matches the form, tracking sent. A checklist catches the errors of a tired or interrupted person, which is why pilots and surgeons use them. Standard work is also the thing a first helper is trained from. Without standard work, a new person learns your habits, including the bad ones.
The standard is the baseline for the next improvement. You keep two figures on a card, cycle time and wrong parcels per 200 orders, and check them each month. This is the Control of DMAIC and the Act of PDCA.
Measure before spending
You believed you needed a helper. The map showed that 14 of every 21 minutes went on work that added no value, and the cure cost a form, some shelf labels and a card. Decisions about capacity, stock and suppliers are covered under Operations management. Process improvement is the habit that comes before spending: measure the work, name the waste, change one thing, measure again, and write down what worked.